Ops command brief · Bay Area

Justin Terranova

Operations & Program Leader Who Builds His Own BI Systems

I run operations and programs, then build the systems that make them measurable — 20+ years across utilities, logistics, manufacturing, and events, pairing operational leadership with hands-on BI and data work most leaders hand off to someone else.

Justin Terranova in a suit
San Jose / Los Gatos Available for PM · BI · program leadership
01

Impact

Selected metrics from roles across logistics, events, and analytics programs.

0 Years leadership
0 Inventory accuracy from 75%
$0 Annual savings load-list errors
0 Labor cost reduction
02

Capabilities

How I lead teams and ship analytical systems that operators actually use.

01

Leadership

Build accountability systems for supervisors and large hourly teams — clear targets, coaching loops, and urgency without chaos.

02

BI / Analytics systems

Design Power BI, SQL, Excel/VBA, and Tableau workflows that turn operational noise into WOR/DOR reporting and decision-ready dashboards.

03

Ops excellence

Inventory accuracy, route compliance, labor forecasting, and Six Sigma / Kaizen programs that protect safety and throughput.

04

Cross-functional delivery

Partner with executives, field operators, and engineering to ship programs spanning ERP, fleet, and multi-site logistics.

03

Selected outcomes

Problem → approach → result, drawn from live operational roles.

CEVA Logistics · Tesla contract

Inventory from 75% → 99%

Problem
High inventory variance (>$0.3M) and accuracy risk on a Tesla logistics site.
Approach
Led 16 directs and 250+ associates; drove Six Sigma Kaizen; tightened cycle counts and control.
Outcome
Accuracy to 99%; variance to <$5k monthly; three regional Kaizen wins; zero line-down for Tesla.

Stuart Event Rentals

35% average monthly labor cost cut

Problem
Labor spend and planning lacked a repeatable operating rhythm.
Approach
Built a Weekly Ops Planning System, automated labor forecasting, and a structural load-list calculator.
Outcome
35% average monthly labor cost reduction while improving planning discipline.

MSC · Vessel Reconciliation

$2.3M savings via error reduction

Problem
Load-list errors were driving costly rework across vessel reconciliation.
Approach
Built MsClean VB automation; led Excel help desk/training for 7 directs and 45+ indirects.
Outcome
88% load-list error reduction (~$2.3M annual savings in 2009).

Peaxy Inc.

BI that cut labor cost 15%

Problem
Leadership needed clearer operational visibility to manage cost.
Approach
Partnered with VP Ops and CEO; built BI dashboards and large-dataset visualization.
Outcome
Dashboards contributed to a 15% labor cost reduction.

United Site Services

Route compliance 92% → 98%

Problem
High-volume branch ops needed tighter compliance and fleet control.
Approach
Led 10,000+ services/week across 5 departments; managed supervisors, 60 indirects, 80+ vehicle fleet.
Outcome
Route compliance to 98%; seven months with zero safety incidents.
04

Experience

Compact timeline — full detail on the resume.

  1. BI/Analytics Project Manager – PG&E (Contract via Evergreen)

    Bay Area

    BI systems, data analysis, and process automation for PG&E construction — WOR/DOR, Construction Manager Dashboard, cycle-time analytics; PgClean invoice reconciliation.

  2. Operations Branch Manager

    United Site Services · San Jose

    10,000+ services/week; route compliance 92%→98%; zero safety incidents for seven months.

  3. Senior Program Manager

    Peaxy, Inc.

    Executive partnership on ops priorities; BI dashboards contributing to 15% labor cost reduction.

  4. Director of Operations

    Stuart Event Rentals · Milpitas

    35% avg monthly labor cost reduction; Weekly Ops Planning System; automated forecasting.

  5. Operations Manager — Tesla Contract

    CEVA Logistics · San Francisco Bay Area

    250+ associates; inventory 75%→99%; variance <$5k/mo; zero line-down.

  6. Project Manager

    Peaxy, Inc. · San Francisco Bay Area

    Programs up to $8M annualized revenue; teams of up to 50 developers; ERP project accounting.

  7. National Equipment Operations Manager

    MSC · New York

    8 direct / 50 indirect; fleet maintenance costs −16% from 2013–2015 (>$3M).

  8. National Vessel Reconciliation Manager

    MSC · New York

    MsClean automation; 88% load-list error reduction (~$2.3M annual savings).

  9. Ocean Import Supervisor

    DACHSER USA · Valley Stream, NY

  10. Air Freight Lead

    M&M Militzer & Münch · Frankfurt, DE

Education · B.A. Art · Washington College · 2001–2005 · Power BI (Udemy, Nov 2024) · Dale Carnegie · OSHA 10 · Vistage

05

Tools & stack

Technical line from professional experience.

  • Data Analytics
  • Dashboard Building
  • Project Management
  • Organizational Leadership
  • Strategic Planning
  • Power BI / DAX
  • Data Modeling
  • Process Automation
  • VBA
  • SQL
  • Excel
  • Tableau
  • Fleet / Ops
  • Lean Six Sigma

Full skills inventory →

06

Let’s talk operations

Open to conversations about project management, BI systems, and technical program leadership.

17224 Debbie Road · Los Gatos, CA 95033